ARCHSPLACE
Architecture, made simple — since 2018

— Ideas & inspiration

Bathroom refurbishment guide

Bathroom refurbishment involves rethinking a wet room’s layout, finishes, plumbing, lighting and ventilation so the space works better and lasts longer. A professional is usually required when you are moving plumbing, changing electrics, altering walls, waterproofing a shower area or managing multiple trades. The outcome depends most on the existing conditions, the chosen specification and how well the work is coordinated on site.

  • refurbishment
  • bathroom

— The project

What to expect

Typical duration

Typically a few weeks to a couple of months

Cost

Usually a medium-to-high renovation budget, depending on scope

— The process

How it works

  1. 1Survey and diagnosis

    Start by checking the room’s measurements, plumbing runs, ventilation and any signs of moisture damage, because the existing conditions define what is realistically possible.

  2. 2Design

    Develop the layout, fixtures and finish schedule so the room balances practicality, comfort and maintenance, not just appearance.

  3. 3Quotes

    Request comparable quotations from the right trades so you can see where costs differ, what is excluded and how the work will be sequenced.

  4. 4Construction

    Carry out demolition, first fix, waterproofing, tiling and final installation in a disciplined order, because bathrooms depend on clean coordination.

— The price

What drives the price

↑ Raises the cost
  • layout changes
  • relocating plumbing
  • premium tiles and fittings
  • hidden damp repairs
↓ Lowers the cost
  • keeping the existing layout
  • standard-size fixtures
  • off-the-shelf finishes
  • minimal electrics changes

Describe your project and receive proposals

  • The space and the scope
  • The style you want
  • Timing and budget
Start my brief →

— Ideas

Ideas by style

modern house — kitchen (urban)
kitchen house modern urban
modern house — bathroom (urban)
bathroom house modern urban
modern house — bedroom (urban)
bedroom house modern urban
modern penthouse — kitchen (urban)
kitchen penthouse modern urban
minimalistSee ideas →
minimalist house — room (urban)
room house minimalist urban
minimalist home — room (urban)
room home minimalist urban
minimalist condo — room (urban)
room condo minimalist urban
minimalist house — room (urban)
room house minimalist urban
rustic farmhouse — room (rural)
room farmhouse rustic rural
rustic farmhouse — room (rural)
room farmhouse rustic rural
rustic house — room (urban)
room house rustic urban
rustic house — room (rural)
room house rustic rural
eclectic house — room (urban)
room house eclectic urban
eclectic house — room (urban)
room house eclectic urban
eclectic apartment — room (urban)
room apartment eclectic urban
eclectic house — room (urban)
room house eclectic urban

— Professionals

Who has already built it

— Questions

Frequently asked questions

How much does a bathroom refurbishment cost?

Costs vary widely with room size, finish level, plumbing changes and whether hidden repairs are needed. Simple refreshes sit at the lower end, while full refits with premium materials and layout changes sit much higher.

How long does a bathroom refurbishment take?

A straightforward refurbishment can often be completed in a few weeks, but more complex projects take longer if structural work, drying time or bespoke items are involved. Delays are common when trades must work in a tight sequence.

Do I need permits for a bathroom refurbishment?

Sometimes, but not always. Permits or approvals may be needed if you change drainage, ventilation routes, electrics, walls or shared building systems, so it is worth checking local rules early.