Pipe

PlanPUin the studio

Pipe

Pipe draws a pipe by hand between two clicks, in the system chosen beside the tools: cold water, hot water, drainage or rain. Its ends join other pipes of the same system, and its diameter and slope are set in its panel.

What it is

Pipe draws one straight pipe from one point to another, by hand. The list beside the tools chooses its system; in a project under the US template, cold water, hot water, sanitary drainage or storm drainage. The plumbing the studio lays by itself from the plumbing points does not need this tool; it is for the runs you want to draw yourself.

A pipe is a run, like a wall or a beam: an end you put on the end of another pipe of the same system joins it, selected pipes show grips where they meet, and a joint moves with every pipe meeting there.

When to use it

  • Drawing an existing pipe of a survey.
  • Adding a run the automatic layout does not make, such as a rainwater pipe along a terrace.

The steps

  1. Take the tool. Type P then U quickly, or pick it on the toolbar, where it shares one button with the other plumbing tools. The status bar says to click the start and the end.

    The Pipe button on the toolbar with Plumbing on and the status bar saying to click the start and the end, over a living room and a bathroom with a WC in its corner.
  2. Choose the system. Pick it in the list beside the tools.

    The list beside the tools open on Sanitary drainage, the system the pipe will be drawn in; nothing is drawn yet.
  3. Click the start. The magnet holds the click on the nearest point within reach.

    One click on the WC's centre starts the run: a dashed purple line follows the hand north with its length beside the cursor, and nothing is written yet.
  4. Click the end, or type the length. Click where the pipe ends, or type its length in the project's units and press Enter to end it that far toward the cursor. Shift, or F8 while it is on, keeps it horizontal or vertical. Each pipe takes two new clicks.

    The length typed and Enter pressed: a straight sanitary pipe, 4 ft long, now runs north from the WC and the outliner counts one pipe.
  5. Set it in its panel. Select the pipe with Select to change its system, its diameter, its slope in percent, or its length.

    Select has taken the pipe: its panel opens with its level, system, diameter and length, and 3 is typed in the Slope field, which shows 3% on the plan.

What it refuses

  • A pipe under 10 cm. A click or a typed length that would make a pipe shorter than 10 cm draws nothing, and a message says a pipe run is at least that long.
  • A slope out of range. A slope must lie between 0 and 50 percent.

What it writes to the contract

One new entry at the end of the project's list of pipes, as one step that one undo takes back: the level, the system, its two ends in meters, and the phase the view draws in. An end that joined another pipe of the same system is written at exactly that end. The diameter and the slope are written when you set them in the panel.

Concepts

Common questions

Do I need to draw pipes for every fixture?

No. The supply and the drainage from the plumbing points are laid by the studio. The Pipe tool is for a run you want to draw yourself.

Why can't I draw a very short pipe?

A pipe run is at least 10 cm long. A shorter one is refused before it is drawn, with that reason.